• Coronavirus
  • News
  • Politics
  • Business
  • Sports
  • World
  • More
    • Health
    • Education
    • Crime
    • Legal
    • Travel & Tourism
    • Lifestyle
    • Science & Technology
  • Entertainment & Arts
  • Our Radio Schedule
Sunday, July 27, 2025
  • Login
Plan B 104.5 FM
  • Coronavirus
  • News
  • Politics
  • Business
  • Sports
  • World
  • More
    • Health
    • Education
    • Crime
    • Legal
    • Travel & Tourism
    • Lifestyle
    • Science & Technology
  • Entertainment & Arts
  • Our Radio Schedule
No Result
View All Result
  • Coronavirus
  • News
  • Politics
  • Business
  • Sports
  • World
  • More
    • Health
    • Education
    • Crime
    • Legal
    • Travel & Tourism
    • Lifestyle
    • Science & Technology
  • Entertainment & Arts
  • Our Radio Schedule
No Result
View All Result
Plan B 104.5 FM
No Result
View All Result
Home Featured

Roads Minister Directs Engineers To Repair Medie – Nsawam Road

Share on FacebookShare on Twitter

Mr Kwasi Amoako-Atta, Minister of Roads and Highways, has directed Maripoma Limited, an engineering company constructing the Accra-Kumasi road to within two weeks, complete a major sectional repair of the Medie-Nsawam stretch and open it to traffic.

Upon completion, the stretch, which was turned to a single-lane, would be expanded to a dual carriageway and help to ease traffic congestion on the road during and after the Christmas festivities.

The Minister, gave the directive during inspection of the progress of the project.
The Minister was accompanied by representatives from the Ministry, the Ghana Highways Authority and the Ga West Municipal Assembly.

“What I am telling you is not an appeal. It’s a precise directive that I’m giving you. Make an arrangement to work day and night because between now to Christmas, we will have heavy traffic on our roads and inconveniences must be minimal as much as possible for motorists.”

Mr Amoako-Atta said the Accra-Kumasi road was a central corridor that conveyed motorists to different parts of the country.

He therefore tasked the engineers to speed up with the repairs on the service roads, to represent the score fraction of the main dual-carriage project.

The Minister reiterated: “I know you are capable and have the efficiency to work as you won the contract on the basis of competence. I want to see major work going on; I mean real action on the ground.”

Mr Ahmed Saeed, the Lead Engineer working, gave an assurance that they were going to heed to the directive of the Minister and deliver as expected.

However, he entreated the Minister to get them a “right of way” to work in order not to slow the progress of their work.

Previous Post

Six Defeated Presidential Candidates Preach Peace

Next Post

NDC Wins Sene West Seat By 16-Vote Margin

Related Posts

NPP Pays Tribute To Highlife Legend Daddy Lumba
News

NPP Pays Tribute To Highlife Legend Daddy Lumba

July 27, 2025
Mentally Challenged Man Allegedly Murders Grandparents
News

Man Fatally Stabbed During Altercation At China City Mall In Kumasi

July 26, 2025
Nationwide special voting exercise begins today
News

EC Sets September 2 For Crucial Akwatia By-Election

July 26, 2025
Next Post

NDC Wins Sene West Seat By 16-Vote Margin

Discussion about this post

Listen LiVE

Plan B 104.5 FM

© 2021 Plan B 104.5 FM - All Rights Reserve. Powered. Unity Websoft.

Navigate Site

  • Advertise
  • Privacy Policy
  • Contact

Follow Us

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In
No Result
View All Result
  • Coronavirus
  • News
  • Politics
  • Business
  • Sports
  • World
  • More
    • Health
    • Education
    • Crime
    • Legal
    • Travel & Tourism
    • Lifestyle
    • Science & Technology
  • Entertainment & Arts
  • Our Radio Schedule

© 2021 Plan B 104.5 FM - All Rights Reserve. Powered. Unity Websoft.