• Coronavirus
  • News
  • Politics
  • Business
  • Sports
  • World
  • More
    • Health
    • Education
    • Crime
    • Legal
    • Travel & Tourism
    • Lifestyle
    • Science & Technology
  • Entertainment & Arts
  • Our Radio Schedule
Saturday, September 13, 2025
  • Login
Plan B 104.5 FM
  • Coronavirus
  • News
  • Politics
  • Business
  • Sports
  • World
  • More
    • Health
    • Education
    • Crime
    • Legal
    • Travel & Tourism
    • Lifestyle
    • Science & Technology
  • Entertainment & Arts
  • Our Radio Schedule
No Result
View All Result
  • Coronavirus
  • News
  • Politics
  • Business
  • Sports
  • World
  • More
    • Health
    • Education
    • Crime
    • Legal
    • Travel & Tourism
    • Lifestyle
    • Science & Technology
  • Entertainment & Arts
  • Our Radio Schedule
No Result
View All Result
Plan B 104.5 FM
No Result
View All Result
Home News

GRIDCo reports ECG to Energy Minister over failure to follow load management instructions

I Will Lead My Kumasi People On Demo If Ken Ofori-Atta Allocates Funds For Keta Sea Defense Project – Energy Minister
Share on FacebookShare on Twitter

The Ghana Grid Company Limited (GRIDCo) has expressed concerns over the Electricity Company of Ghana’s failure to provide a load-shedding timetable for customers amidst ongoing power outages.

For several months now, parts of Ghana have been experiencing intermittent power supply, commonly known as ‘Dumsor’.

There has been an ongoing dispute between ECG and GRIDCo regarding the power outages.

In a compliance letter sent to the Ministry of Energy, Dr Matthew Opoku Prempeh, dated March 28, GRIDCo voiced serious concerns about ECG’s failure to follow the load-shedding management instructions issued by the National System Control Center (NSCC).

GRIDCo stated that ECG’s non-compliance poses a significant risk to the stability of the power grid, citing instances where ECG’s failure to comply has led to a drop in system frequency in some areas.

“We note with grave concern the repeated instances where Electricity Company of Ghana (ECG) Operations personnel fail to follow load management instructions issued by the SCC. This non-compliance poses a significant threat to the stability of the power grid, potentially leading to:  Avoidable power outages for customers and system collapse.

“The SCC routinely communicates load management directives to ECG Operations. However, these instructions are often either not effected or inadequately implemented. This results in a decline in system frequency, triggering:

• The operation of the Automatic Frequency Load Shedding (AFLS) relays,

• SCC having to disconnect feeders serving bulk customers to correct the decaying frequency.”

GRIDCo has stated that instances where they are blamed for emergency disconnections do not accurately reflect the current situation. They added that ECG’s disregard for load management instructions is a breach of regulations.

“When these emergency disconnections occur, ECG publishes customer notices attributing the loss of power supply to GRIDCo, which is not an accurate description of the current situation. Furthermore, ECG’s disregard for load management instructions is a clear violation of the regulations.”

As a result, GRIDCo is urging the Minister, to intervene to ensure ECG complies with the issuance of a load shedding timetable.

“We therefore bring this to your kind attention, Honourable Minister, and seek your urgent intervention to ensure cooperation from ECG with respect to load management operations.”

——

Source: CNR
Previous Post

President Akufo-Addo swaps Upper East and Upper West Regional Ministers

Next Post

400 Graphic Communications Group workers prepare to resist company sale

Related Posts

Nsawam-Pokuase Road Flooded After Hours Of Downpour
News

Nsawam-Pokuase Road Flooded After Hours Of Downpour

September 13, 2025
GBC, PSWU  workers fight management over All African Games allowance, conditions of service
News

Mounting Power Costs Force GBC to Shut Down Two Studios

September 13, 2025
Abronye DC dragged before NIB over ₵550M allegations against President Mahama
News

NPP’s Abronye Remanded For One Week

September 12, 2025
Next Post
400 Graphic Communications Group workers prepare to resist company sale

400 Graphic Communications Group workers prepare to resist company sale

Discussion about this post

Listen LiVE

Plan B 104.5 FM

© 2021 Plan B 104.5 FM - All Rights Reserve. Powered. Unity Websoft.

Navigate Site

  • Advertise
  • Privacy Policy
  • Contact

Follow Us

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In
No Result
View All Result
  • Coronavirus
  • News
  • Politics
  • Business
  • Sports
  • World
  • More
    • Health
    • Education
    • Crime
    • Legal
    • Travel & Tourism
    • Lifestyle
    • Science & Technology
  • Entertainment & Arts
  • Our Radio Schedule

© 2021 Plan B 104.5 FM - All Rights Reserve. Powered. Unity Websoft.