• Coronavirus
  • News
  • Politics
  • Business
  • Sports
  • World
  • More
    • Health
    • Education
    • Crime
    • Legal
    • Travel & Tourism
    • Lifestyle
    • Science & Technology
  • Entertainment & Arts
  • Our Radio Schedule
Sunday, January 18, 2026
  • Login
Plan B 104.5 FM
  • Coronavirus
  • News
  • Politics
  • Business
  • Sports
  • World
  • More
    • Health
    • Education
    • Crime
    • Legal
    • Travel & Tourism
    • Lifestyle
    • Science & Technology
  • Entertainment & Arts
  • Our Radio Schedule
No Result
View All Result
  • Coronavirus
  • News
  • Politics
  • Business
  • Sports
  • World
  • More
    • Health
    • Education
    • Crime
    • Legal
    • Travel & Tourism
    • Lifestyle
    • Science & Technology
  • Entertainment & Arts
  • Our Radio Schedule
No Result
View All Result
Plan B 104.5 FM
No Result
View All Result
Home News

Portions of La beach road to be blocked for three months over land bridge construction

Portions of La beach road to be blocked for three months over land bridge construction
Share on FacebookShare on Twitter

The Ministry of Roads and Highways says free flow of vehicular traffic will be disrupted on the Kpeshie lagoon stretch on the La beach road for three months effective Thursday, September 15 to Thursday, December 15, 2022.

The interruption of traffic is a result of the construction of a new two-third lane bridge over the Kpeshie lagoon.

In a statement issued by the Roads Ministry, through the Department of Urban roads, it entreated motorists to follow all traffic management signs that will be placed at vantage points on the road.

The department also urged motorists to use alternative routes to their destination.

Source: planbfmonline
Previous Post

Black Sherif bags BET Hip Hop Awards nomination

Next Post

International Maritime Hospital Celebrates 5th Anniversary 

Related Posts

Politicians Have Hijacked The Importation Of ECG Meters – PUWU
News

Accountability for power: Eric Dawda invokes RTI Act to demand justification for rising utility tariffs

January 18, 2026
Majority Against The E-levy Are From NPP Strongholds – Dramani Dzramado
News

“Ofori-Atta has been moved from the Caroline Detention Centre”: Ambassador Smith discloses

January 18, 2026
Family Fumes As Dubai Firm Buries Nigerian Man Killed In Factory Accident Without Their Knowledge
News

Two engineers killed in bulldozer accident at ‘Big Push’ project in Ayensudo

January 17, 2026
Next Post
International Maritime Hospital Celebrates 5th Anniversary 

International Maritime Hospital Celebrates 5th Anniversary 

Discussion about this post

Listen LiVE

Plan B 104.5 FM

© 2021 Plan B 104.5 FM - All Rights Reserve. Powered. Unity Websoft.

Navigate Site

  • Advertise
  • Privacy Policy
  • Contact

Follow Us

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In
No Result
View All Result
  • Coronavirus
  • News
  • Politics
  • Business
  • Sports
  • World
  • More
    • Health
    • Education
    • Crime
    • Legal
    • Travel & Tourism
    • Lifestyle
    • Science & Technology
  • Entertainment & Arts
  • Our Radio Schedule

© 2021 Plan B 104.5 FM - All Rights Reserve. Powered. Unity Websoft.