• Coronavirus
  • News
  • Politics
  • Business
  • Sports
  • World
  • More
    • Health
    • Education
    • Crime
    • Legal
    • Travel & Tourism
    • Lifestyle
    • Science & Technology
  • Entertainment & Arts
  • Our Radio Schedule
Monday, July 27, 2026
  • Login
Plan B 104.5 FM
  • Coronavirus
  • News
  • Politics
  • Business
  • Sports
  • World
  • More
    • Health
    • Education
    • Crime
    • Legal
    • Travel & Tourism
    • Lifestyle
    • Science & Technology
  • Entertainment & Arts
  • Our Radio Schedule
No Result
View All Result
  • Coronavirus
  • News
  • Politics
  • Business
  • Sports
  • World
  • More
    • Health
    • Education
    • Crime
    • Legal
    • Travel & Tourism
    • Lifestyle
    • Science & Technology
  • Entertainment & Arts
  • Our Radio Schedule
No Result
View All Result
Plan B 104.5 FM
No Result
View All Result
Home Featured

Contractors Urged To Build Roads Professionally Over Rivers

Share on FacebookShare on Twitter

Μr Aaron Adᴜna, the Upper East Regional Director of the Water Resources Commission has urged road contractors to professionaly build roads on major rivers in order to prevent damage from floods.

He said the experience of the recent floods in the Upper East and North East Regions had shown the need to have the roads raised higher at flood prone areas to protect the culverts and Bridges.

Μr Adᴜna, who was reacting to the recent floods in the Upper East Region  in an interview with the GNA, pointed to the overflow of the White Volta River over the Pwalᴜgu Bridge in the Talensi District and the Kobore  Bridge in the Bindᴜri District as drainage challenges and advised that roads on such stretches should be raised to ensure  that water did not collect when rivers overflow.

He noted that the water level of the River at the Pwalᴜgᴜ Bridge, at the peak of the floods was 12 meters above the river bed and therefore affected many areas in the district.

The collaborative efforts of NADΜO and stakeholders in the preparation and early sensitization of communities since the Bagre Dam water spillage began in August until the peak of the spillage in September, helped to some extent to reduce the havoc, he said.

“With the torrential rains, there was no better time for the spillage else the damage could have been greater”, he said.

Mr Adᴜna advocated water harvesting technologies to be implemented in the country for storage of water, “the sustainability of the White Volta River depends on water and therefore the waste that is likely to occur after the runoffs could have been saved and used for irrigation and power generation”.

Previous Post

Akufo-Addo Sacks Sekyere East DCE

Next Post

Kumasi Metropolitan Assembly To Seal Leakages In Revenue Mobilization

Related Posts

NDC Set To Elect 2024 Flagbearer In November This Year
News

Opambour questions NDC rule requiring appointees to resign before internal elections

July 27, 2026
Lawra Court jails man 20 years for incest against biological daughter
News

Lawra Court jails man 20 years for incest against biological daughter

July 27, 2026
LGBTQ+ is repugnant to my values and ethics – Haruna Iddrisu
News

Education Minister’s office dismisses alleged AI-generated fake video

July 27, 2026
Next Post

Kumasi Metropolitan Assembly To Seal Leakages In Revenue Mobilization

Discussion about this post

Listen LiVE

Plan B 104.5 FM

© 2021 Plan B 104.5 FM - All Rights Reserve. Powered. Unity Websoft.

Navigate Site

  • Advertise
  • Privacy Policy
  • Contact

Follow Us

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In
No Result
View All Result
  • Coronavirus
  • News
  • Politics
  • Business
  • Sports
  • World
  • More
    • Health
    • Education
    • Crime
    • Legal
    • Travel & Tourism
    • Lifestyle
    • Science & Technology
  • Entertainment & Arts
  • Our Radio Schedule

© 2021 Plan B 104.5 FM - All Rights Reserve. Powered. Unity Websoft.